Al Qusais is one of the older mixed residential and industrial districts in Dubai, split across the numbered sub-communities of Al Qusais 1, 2 and 3 plus the Industrial Areas 1 to 5 further east. Many of the apartment blocks here were built from the 1980s through the early 2000s, which means original bathroom fittings, ageing waterproofing and outdated pipework are common renovation starting points. We handle full bathroom renovations for apartment owners, villa owners in the Al Qusais residential pockets and landlords upgrading units before a new tenancy, with particular attention to the plumbing condition typical of this generation of building stock.
Last Updated: August 16, 2026
A full bathroom renovation covers demolition of the existing room down to the slab and studwork, correction of any floor level or slope issues, a full waterproof membrane system, new tiling, and replacement of every fixture — toilet, vanity, shower or bath, taps and drainage. In Al Qusais this generally starts with an assessment of what is actually behind the existing tile, since a meaningful share of the older apartment blocks here have had at least one prior bathroom update layered over the original 1980s or 1990s installation rather than a true strip-back renovation. Layered tile jobs are a common discovery once demolition starts, and they typically explain why an older Al Qusais bathroom sits noticeably higher at the threshold than the corridor outside it.
Villa bathrooms in the residential pockets of Al Qusais 1 through 3 tend to have larger floor areas and more original 1990s-era sanitaryware than apartment bathrooms in the mid-rise blocks, so a villa renovation here more often includes full re-plumbing rather than a straightforward fixture swap.
Al Qusais is unusual among Dubai districts in that it functions as several distinct zones under one name. Al Qusais 1, 2 and 3 are primarily residential, with a mix of low-rise apartment blocks — typically ground-plus-four to ground-plus-seven — built mainly from the 1980s through the early 2000s, alongside pockets of older villas along the internal residential streets. Further east, Al Qusais Industrial Areas 1 through 5 are predominantly warehouses, workshops and labour accommodation, with far fewer standard residential renovation calls but a steady volume of staff-accommodation bathroom upgrade work for property managers maintaining those buildings.
The area sits close to the Dubai-Sharjah border and is well served by Al Ittihad Road and Damascus Street, with the Al Qusais and Dubai Airport Free Zone Metro stations on the Red Line providing good access for our technicians regardless of traffic conditions on the main roads. Because many Al Qusais apartment buildings do not have dedicated goods lifts, tile and fixture delivery to upper floors is scheduled with the building watchman in advance, which we factor into the project timeline during the initial site visit rather than treating it as a surprise on demolition day.
Given the age profile of the area, we routinely find a mix of original galvanised steel and later copper or CPVC pipework in the same building, sometimes in the same apartment. Identifying which sections have already been upgraded and which have not is one of the first things our plumber checks once the old tile is removed, since it affects whether a full re-pipe is recommended alongside the cosmetic renovation.
We confirm the full scope, including any plumbing findings, before work proceeds past the demolition stage.
Typical timeline: 7 to 14 working days for a standard renovation, extending toward 16 to 18 days where pipework replacement is required alongside the cosmetic work.
Because a meaningful share of Al Qusais apartment blocks were built before modern wet-area waterproofing standards became standard practice on Dubai residential projects, we treat the waterproof membrane stage as the priority regardless of how the original bathroom was finished. On buildings where we confirm the concrete slab has settled or is not level, we allow additional time for a screed correction layer before the membrane goes down, since tiling directly onto an uneven older slab is one of the more common causes of a renovation not lasting. For fixtures, UAE hard water affects Al Qusais properties in the same way as the rest of Dubai, so we default to ceramic-disc valves and ask clients whether they want a self-cleaning shower head given how much less frequently it needs descaling compared with a standard head.
Grout choice matters slightly more in some of the ground-floor and lower-level Al Qusais units near the older internal courtyards, where humidity can sit a little higher than in upper-floor apartments — epoxy grout is our standard recommendation across all tiers of renovation here rather than only on premium jobs.
| Situation | Recommended Approach |
|---|---|
| Single failed fixture, tile and pipework otherwise sound | Targeted repair or fixture swap |
| Dated look but no water damage or pipework issues | Cosmetic refresh — new tile face, toilet, vanity |
| Original 1980s-1990s fit-out, staining, hollow tile | Full renovation with waterproofing and pipework check |
| Layered tile-over-tile discovered on inspection | Full strip-back renovation only — layering again is not advised |
Given how much building age varies within Al Qusais, choosing a contractor who actually checks pipework condition before quoting, rather than working from a generic price list, matters more here than in newer developments. Ask specifically whether the quote assumes standard demolition or includes an allowance for a possible layered-tile discovery, since that is common enough in this area to plan for rather than treat as an unexpected extra cost mid-project. Also confirm the contractor is comfortable coordinating goods lift or stairwell delivery access with your building management, since a number of Al Qusais blocks do not have a dedicated service lift.
Call +971564528505 for a free site visit, honest pipework assessment and written quote.
Also serving all Dubai communities:
Full renovation including tiling, fixtures and waterproofing.
| Service | Starting Price |
|---|---|
| Small Bathroom Refresh | AED 5,000–10,000 |
| Standard Bathroom Remodel | AED 10,000–20,000 |
| Luxury Bathroom Renovation | AED 20,000–50,000 |
| Tiling Only (per m²) | AED 60–150/m² |
| Shower Enclosure Install | AED 2,000–6,000 |
| Full Fixture Replacement | AED 3,000–8,000 |
Prices are indicative. Final quote confirmed on site before work begins. WhatsApp us for a free estimate.
A standard bathroom renovation in Al Qusais typically costs AED 8,000 to 22,000, with premium renovations up to AED 45,000. Older buildings sometimes need additional pipework work, which we confirm and price separately after the site visit.
Not always, but it is common enough that we check pipe material and valve condition at the quote stage. Buildings from the 1980s and 1990s sometimes still have sections of original galvanised piping that benefit from replacement while the bathroom is already stripped back.
A standard renovation takes 7 to 14 working days. Buildings without a dedicated goods lift, common in parts of Al Qusais 1-3, can add a small amount of time for coordinated material delivery.
A degree of settlement is common in older buildings in this area, but a bathroom floor should still slope evenly toward the drain. Uneven settling is corrected with levelling compound during a full renovation before new tile is laid.
Yes, we renovate both apartment and villa bathrooms across Al Qusais 1, 2 and 3. Villa bathrooms in this area often have larger floor plans and more original 1990s sanitaryware, which we factor into the scope and quote.
Yes, we work with property managers on staff accommodation bathroom upgrades across Al Qusais Industrial Areas 1 to 5, usually scheduled around occupancy to minimise disruption.
This is common enough in older Al Qusais buildings that we flag it as a possibility at the quote stage. If found, we remove both layers back to the slab rather than tiling over the problem again, and confirm any cost adjustment with you before continuing.
"Excellent Bathroom Renovation service — technician arrived within 45 minutes. Very professional and the problem was fixed on the same visit. Will definitely call again."
"Best Bathroom Renovation company in Dubai. Fair pricing, honest technicians and they did a thorough job. No hidden charges. Highly recommended!"
"Used Contractors UAE for Bathroom Renovation at my villa. Response was super fast, the team was clean and professional. Fixed everything perfectly. 5 stars!"
WhatsApp us now for a free quote — we respond in minutes. Available 24/7 across UAE.