Dubai Production City, formerly known as IMPZ, mixes mid-rise apartment towers such as the Skycourts complex with office and light-industrial units used by printing, publishing and production companies. This gives us a genuinely mixed workload here — full apartment bathroom renovations for residents, and smaller washroom refurbishment jobs for the offices and production facilities nearby. We quote both categories with a fixed price and handle building management coordination for apartment towers.
Last Updated: August 16, 2026
Dubai Production City, still widely known by its earlier name IMPZ (International Media Production Zone), sits along Sheikh Mohammed Bin Zayed Road next to Dubai Studio City and Motor City. Unlike a purely commercial free zone, Production City has a genuine residential population living in mid-rise apartment towers, most notably the Skycourts Towers cluster, alongside the office and light-industrial units occupied by printing presses, publishing houses and production companies that gave the district its name. This mixed character means our bathroom renovation work here is more evenly split between residential apartment remodels and commercial washroom refurbishment than in a purely office-led free zone.
Apartment towers in Production City are generally newer mid-rise buildings, most under 15 years old, with standard concrete-and-block bathroom construction and centralized plumbing risers shared between units on the same stack. This affects renovation planning in one specific way worth flagging honestly: any work involving the shared plumbing riser, rather than fixtures within a single unit, usually needs building management coordination and sometimes a scheduled water shut-off affecting neighboring units, which we plan around in advance rather than discovering on the day. Office and production-facility washrooms in the district tend to be simpler in layout than a media tower washroom, generally a small number of stalls and basins per floor, which keeps commercial refurbishment jobs here comparatively quick.
A full bathroom renovation strips the space back to the structural walls and floor, replaces the waterproofing membrane, and rebuilds with new tiling, plumbing fittings and fixtures. A partial refresh instead swaps out visible elements — the vanity, toilet suite, shower fittings or tiling on one wall — while leaving sound waterproofing and layout untouched. Which approach makes sense depends mainly on the age and condition of the existing waterproofing, not simply how outdated the fixtures look.
A full apartment bathroom renovation in Dubai Production City typically costs AED 8,000 to AED 30,000, with smaller studio-unit bathrooms toward the lower end and larger multi-bathroom units toward the upper end. Commercial washroom refurbishment in offices and production facilities is quoted after a site visit based on fixture count and finish level.
| Factor | Full Renovation | Partial Refresh |
|---|---|---|
| Scope | Demolition, new waterproofing, tiling, fixtures, layout changes | Fixture and surface swap on sound waterproofing |
| Typical duration | 7 to 12 days | 1 to 3 days |
| Riser coordination needed | Often, if pipework is relocated | Rarely |
| Typical cost | AED 8,000 to AED 30,000 | AED 2,500 to AED 7,500 |
Skycourts and the other apartment towers in Dubai Production City are managed by owners associations or facilities management companies, and most require advance notice of any renovation work, particularly where a water shut-off affects other units on the same riser. We handle this coordination directly, including confirming lift booking for material transport and agreeing a schedule that limits inconvenience to neighboring residents. Office and production-facility units in the district generally follow a simpler landlord notification process, since these are usually single-tenant spaces without shared risers to coordinate.
Dubai Production City genuinely combines residential apartment living with the office and production-facility businesses the area was built for, and a bathroom renovation project here needs to account for whichever setting applies. Apartment renovations in towers such as Skycourts require riser coordination and building notification that a standalone villa would not need, while office and production-facility washroom work tends to be faster and simpler. Either way, proper waterproofing with a flood test and a fixed written quote remain the two non-negotiables worth insisting on before work begins.
Call +971564528505 — free quote, building coordination included for apartment towers.
Also serving all Dubai communities:
Full renovation including tiling, fixtures and waterproofing.
| Service | Starting Price |
|---|---|
| Small Bathroom Refresh | AED 5,000–10,000 |
| Standard Bathroom Remodel | AED 10,000–20,000 |
| Luxury Bathroom Renovation | AED 20,000–50,000 |
| Tiling Only (per m²) | AED 60–150/m² |
| Shower Enclosure Install | AED 2,000–6,000 |
| Full Fixture Replacement | AED 3,000–8,000 |
Prices are indicative. Final quote confirmed on site before work begins. WhatsApp us for a free estimate.
Yes, we regularly work in Skycourts and other apartment towers in Dubai Production City, including coordinating any required building notification for shared plumbing risers.
A full apartment bathroom renovation typically takes 7 to 12 days depending on size and whether shared riser work is involved. A partial refresh can be completed in 1 to 3 days.
Yes, we service the office and light-industrial units common in the district, quoting per fixture count after a site visit.
Only if the work involves the shared plumbing riser rather than fixtures within your own unit. We coordinate any required shut-off with building management and schedule it to minimize inconvenience.
A full renovation typically ranges from AED 8,000 to AED 30,000 depending on unit size, bathroom count and finish level. A partial refresh generally costs AED 2,500 to AED 7,500.
Yes, this is a common request in the studio and one-bedroom layouts found in Production City towers and can usually be completed as part of a full renovation.
Most towers in the area require notification, particularly if the work involves a water shut-off affecting other units. We handle this coordination as part of the project.
"Excellent Bathroom Renovation service — technician arrived within 45 minutes. Very professional and the problem was fixed on the same visit. Will definitely call again."
"Best Bathroom Renovation company in Dubai. Fair pricing, honest technicians and they did a thorough job. No hidden charges. Highly recommended!"
"Used Contractors UAE for Bathroom Renovation at my villa. Response was super fast, the team was clean and professional. Fixed everything perfectly. 5 stars!"
WhatsApp us now for a free quote — we respond in minutes. Available 24/7 across UAE.