Al Rashidiya is one of the established Dubai Municipality villa communities on the eastern side of the city, close to Dubai International Airport and Al Rashidiya Metro Station, with Mirdif bordering it further east and Al Rashidiya Park serving as a well used community green space. Most villas here were built from the 1980s through the 1990s to a limited set of municipality-issued floor plans, generally single-storey or split-level layouts with a fully enclosed, functional kitchen positioned away from the main living and entertaining areas, quite different from the open-plan layouts common in newer freehold communities. Our renovation work here is dominated by two things: bringing genuinely dated original kitchens up to modern standards, and the recurring question of whether an enclosed kitchen can be opened toward the dining or living space at all given the age and construction type of the villa.
Last Updated: August 16, 2026
Al Rashidiya is a well established residential community developed by Dubai Municipality, sitting close to Dubai International Airport and connected by Al Rashidiya Metro Station, with Mirdif immediately to the east and Al Twar not far to the north. The villas here were largely built across the 1980s and 1990s to a relatively small number of repeated municipality floor plans, giving the community a consistent character of single-storey and split-level homes on generous plots, quite different from the varied architect-designed villas found in newer freehold developments. A smaller number of low-rise apartment buildings line some of the main roads through the community, but villas make up the large majority of the housing stock and the majority of our renovation enquiries here.
A full renovation covers removing existing cabinetry, countertop and tiling, replacing or correcting plumbing and electrical infrastructure, and rebuilding with new cabinetry, countertop, backsplash, lighting and ventilation. Because Al Rashidiya villas are now several decades old, a meaningful share of the renovation scope typically involves infrastructure work rather than being purely cosmetic, and because original layouts were designed as fully enclosed, separate kitchens, many projects also involve a genuine conversation about whether and how to open the space toward the dining or living area.
The single most common layout question in Al Rashidiya is whether the wall separating the original enclosed kitchen from the adjoining dining or living space can be removed or opened up, and the honest answer depends on the specific villa construction and floor plan. Because these are older single-storey and split-level villas rather than newer freehold builds, we always start with a structural assessment to confirm which internal walls are load-bearing before any layout change is designed around removing one. Where a wall can be safely opened, the result is usually a meaningful transformation in how the home feels day to day. Where it cannot, we generally focus the renovation on maximising light, storage and workflow within the existing enclosed footprint instead.
Given the age of most Al Rashidiya villas, we assess original plumbing and electrical condition as a standard part of every renovation quote rather than assuming it will not need attention. Original supply pipework in villas of this era sometimes shows the same corrosion issues common to other older parts of Dubai, and electrical circuits were rarely sized for the combination of built-in oven, hob, extraction and small appliances typical of a modern kitchen. Addressing this properly as part of the renovation, rather than working around it, generally saves the homeowner from a second disruptive project a few years later.
Given the proximity of Al Rashidiya to Dubai International Airport, some villas in the community also benefit from acoustic considerations during a kitchen renovation, particularly for homes on the streets closest to the flight path where periodic aircraft noise is more noticeable. Where a client raises this, we can discuss options such as denser wall insulation behind new cabinetry runs or acoustic sealing around any new window openings created as part of a layout change, which makes a genuine, if modest, difference to how the finished kitchen feels day to day compared with leaving the original wall construction untouched.
As a general guide, a specification upgrade without a layout change in an Al Rashidiya villa runs roughly AED 25,000 to 38,000, while a full renovation including opening the kitchen toward the living or dining area runs roughly AED 40,000 to 50,000 depending on the structural scope involved.
| Factor | Specification Upgrade Suits | Layout Change Suits |
|---|---|---|
| Current layout | Enclosed layout works for the household | Household wants a connected living space |
| Wall type | Not a priority to confirm | Confirmed non-load-bearing or engineerable |
| Budget and timeline | Faster, lower cost | Longer, higher cost, bigger transformation |
| Infrastructure | Assessed and updated as needed either way | Assessed and updated as needed either way |
Call +971564528505 — structural assessment for original villa layouts handled as part of the project.
Also serving all Dubai communities:
Scope varies by kitchen size and finish level. Free site survey.
| Service | Starting Price |
|---|---|
| Kitchen Cabinet Replacement | AED 8,000–25,000 |
| Countertop Replacement | AED 2,000–8,000 |
| Kitchen Tiling (floor + wall) | AED 3,000–8,000 |
| Full Kitchen Remodel (budget) | AED 15,000–30,000 |
| Full Kitchen Remodel (luxury) | AED 30,000–80,000 |
| Splashback Only | AED 1,500–4,000 |
Prices are indicative. Final quote confirmed on site before work begins. WhatsApp us for a free estimate.
Often yes, but it depends on whether the separating wall is load-bearing, which requires a structural assessment given the age and construction type of these original municipality villas. We confirm this before any layout design work begins.
A specification upgrade without a layout change runs roughly AED 25,000 to 38,000. A full renovation including opening the kitchen toward the living or dining area runs roughly AED 40,000 to 50,000 depending on structural scope.
Many do, given that most villas were built in the 1980s and 1990s. We assess original pipework and wiring condition as a standard part of every quote rather than assuming it will not need attention.
A specification upgrade without structural work typically takes 3 weeks. A full renovation including a layout change and structural work takes 4 to 5 weeks depending on engineering requirements.
Yes, most original floor plans from this era placed the kitchen as a fully enclosed, functional space separate from living and dining areas, which is different from the open-plan layouts common in newer freehold communities.
We arrange a structural assessment as part of the renovation project before any wall removal or opening is designed, since this cannot be reliably assumed from the floor plan alone in villas of this age.
The community is predominantly villas, though a smaller number of low-rise apartment buildings line some of the main roads through the area.
For villas closest to the flight path, we can discuss modest acoustic measures such as denser wall insulation or sealing around new window openings, which makes a genuine difference to how the finished kitchen feels day to day.
"Excellent Kitchen Renovation service — technician arrived within 45 minutes. Very professional and the problem was fixed on the same visit. Will definitely call again."
"Best Kitchen Renovation company in Dubai. Fair pricing, honest technicians and they did a thorough job. No hidden charges. Highly recommended!"
"Used Contractors UAE for Kitchen Renovation at my villa. Response was super fast, the team was clean and professional. Fixed everything perfectly. 5 stars!"
WhatsApp us now for a free quote — we respond in minutes. Available 24/7 across UAE.